When you are tired of your drab bathroom, it is time to consider a remodel. Even when the project is only supposed to take a couple days, you still want to be thoroughly prepared. That way your Burleson TX bathroom remodeling goes off without a hitch.
The success of any renovation ultimately comes down to the team performing it. You want to look into the reputation of the company you are hiring to ensure they promise results. One way to look into an organization’s reputation is to ask to speak with references. Ask these people whether they were happy with the upkeep during the remodeling process.
One of the biggest problems that comes up with any remodeling project is the presence of dust. As long as the weather outside is hospitable, you can open up some windows to air out the room being worked on. Additionally, this can be beneficial for the people working on your Burleson TX bathroom remodeling because they may like a nice breeze entering the area.
The remodeling team might do this regardless, but you should make sure the room being renovated is blocked off from the rest of your home. This can include putting a tarp over the door frame so that dust does not get into other rooms. Isolation is particularly important if you have any pets in your home. Throughout the renovation, it may be best to kept animals outside or locked in another room so that they do not get into the remodeling debris.
Planning ahead will help you have an enjoyable experience, and the remodeling team will like the fact that you thought about their best interest ahead of time. Even a comprehensive renovation should only take a few days at the most, but no matter what, make sure you hire the best team in your city for your Burleson TX bathroom remodeling.
You’ve finally saved up just enough money to pay for what you thought those granite countertops and stainless steel appliances would cost. A design change here, an installation issue there and you may be faced with a tough reality when those savings don’t quite cut it. It’s also easy to fall into a trap of overspending if your initial estimate is too low or no longer covers the scope of the project.
John Bodrozic, co-founder of the home maintenance and remodeling tracking app HomeZada, believes that while going over budget is common, there are some basic home remodeling tips to avoid overspending.
“Taking the time upfront to plan out your specific design with all of your product choices is a great start,” he says. “People who know what they want and have done the various pricing research make it easier for contractors.”
I recommends signing a contract before the remodel kicks off and making it clear that the price quoted contains everything you agreed upon.
“If the contractor has to add any work, make sure they run it by you first,” she says. “In my experience, our contractors added work, making it seem like it wouldn’t be very much money. Unfortunately, we ended up spending more than we were planning to.”
While everyone dreams of a smooth home remodeling project, consider budgeting for more than your estimate in the event you do run over. You could stash your extra home remodeling funds in an online savings account so they are earning interest while your project is underway.
If you think it’s difficult to keep track of your children’s after-school activities and get them there on time, you’ll be astounded by the complex scheduling that can be involved in a remodel.
Larger projects, like kitchen and bathroom remodels, tend to take more time because there is a specific sequence of different construction trades that must work on bringing everything together, like a complex puzzle. You first have demo and rough carpentry work, then electrical, plumbing and HVAC rough-in work. Then comes work like drywall, finish carpentry and tile trades and, finally, plumbing and electrical trades come back to install the various fixtures.
When you’re determining how to prepare for a remodel, you may consider project delays if the work itself takes more time than expected. Another thing to expect with your remodel is that you could also encounter delays if the next trade person up to complete work is busy with other clients and can’t fit you in right away.
Excited about creating your dream home with the person you love most? Unfortunately, you might not always agree on the shade of cream you want for the bathroom tiles.
Renovations create power struggles. Or maybe one person, acting as the spokesperson for the couple, incorrectly assumes the other partner is on the same page when making a decision.
But before you worry that fights over paint shades will bring conflict to your relationship, knowing that this is one of the things to expect with your remodel will help you prepare.
Couples who are remodeling need to determine a process for making decisions, and designate who has final say when there is a disagreement.
Phil, your contractor, seems like a great guy. You’ve bumped into him at the grocery store and had pleasant conversations. Many people have given him glowing reviews. What’s more, you’ve never raised your voice at someone working for you. But the stakes are high in your renovation project, and that can lead to heated disagreements. The best defense against this is a good offense.
Communicate, communicate, communicate, Make it very clear what you want the result of your project to be. Don’t be afraid to be honest and ask for what you want. This will prevent any disappointment that you might feel if things don’t go the way you’d like.
Although I also believe in the importance of communication, going into the project with reasonable expectations is critical when determining how to prepare for a remodel.
Contractors have other clients and jobs, so they may not always be available immediately, Try to be understanding and avoid being too demanding.
Hoping that your new luxury kitchen will boost your home’s resale value significantly? That might encourage you to spend more than you originally intended. But one of the things to expect with your remodel is that it might not affect your home’s value as much as you anticipated.
In some cases, homeowners can actually over-renovate and spend money that they won’t be able to get back, Every property has a ceiling for its value, and there’s a point of diminishing returns when a remodeling project approaches that top value.
I suggests homeowners talk to a real estate agent as a home remodeling tip to avoid overspending, since an agent can help you better understand the market before starting a renovation.
While your home reno might unfold like an unfunny screwball comedy in which you get the wrong permits, find all sorts of structural problems and have to deal with a contractor you can’t locate, you’ll still be happy once everything is done and you get to live in your remodeled home.
With these home remodeling tips to avoid overspending, a better understanding of how to prepare for a remodel and a thorough knowledge of the things to expect with your remodel, you’ll face fewer surprises and get on to enjoying your upgraded digs.
Do your due diligence before hiring your contractor. Price should not be the only factor when making the final decision on who will build your dream home. Your home is where you spend most of your time, and you don’t want poor quality construction details staring you in the face, day after day. Make sure you take the proper steps before choosing a contractor.
1. Start with a detailed plan. This is the most important item before you even approach a contractor. Work with a professional designer or architect who can come up with a comprehensive plan to show your contractor so that he knows exactly what you have planned for your space. Walking your contractor through your space without a detailed plan in hand will allow the contractor to change his pricing as he goes, since the specifics were never discussed from the beginning.
Please bear in mind that permit drawings are not complete plans and contain limited information about the final design of your space. They provide information about the general layout and structure but have limited or no information pertaining to finishes, interior architecture, custom millwork, lighting and electrical features. This is the information that your contractor will need to give you accurate pricing before you start construction.
2. Provide a list of specifications ahead of time. When it comes to your finishes, fixtures, appliances and accessories, this is your bible. The price to renovate even a small bathroom can vary by tens of thousands of dollars depending on its fittings and finishes. If you can choose your plumbing fixtures, finishes and accessories ahead of time, you will save yourself and your contractor a lot of grief during the construction process by having the items on hand when he needs them and by knowing all the associated costs to install your specified items.
3. Price out your project. If you have been working with a designer or architect and you have a complete set of drawings and complete specifications, ask that professional to recommend a few builders to whom you can send your plans for pricing. Also, ask your friends whether they have a contractor they have been happy with and send them your construction package to bid on as well.
If you have the detailed set of plans and the specs that I mentioned previously, you will get “apples to apples” pricing from the contractors bidding on the job. And the contractors will have to stick to their provided pricing because they had all the information in their hands.
4. Ensure your contractor is insured. I’m sure you’ve all heard horror stories about what can happen on a construction site. Unfortunately, accidents are part of the norm in this industry. A contractor has to manage a significant crew to make your project come together, and it’s not an easy task. Think of your contractor as a composer bringing all the parts of an orchestra together to create a masterpiece. There are bound to be mishaps occasionally, so please make sure your contractor is set up to deal with them properly.
5. Check out your contractor’s work. Once you’ve bid out your project and have a contractor in mind, ask to see some of his previous jobs. Even though the contractor may be referred to you by a friend or your architect, it doesn’t hurt to get a look at his work. If you like what you see, and the owner of the other house is happy with how things turned out, there’s a good chance that you will be happy too.
6. Interview your contractor. You will have to get quite close to your general contractor over the period of your project. Make sure you pick someone you trust and can communicate with. During initial meetings, ask how unexpected issues or differences might be handled. This can include change orders that will be issued by you or your designer in writing.
7. Dealing with the extras. Keep in mind that your contractor may not have priced some items for your renovation, such as closet organizers and bathroom accessories. Ask your contractor how he deals with extras. Some contractors use extras as an opportunity to make as much money as possible during a renovation because you are already committed to them.
8. Ask about timelines. Ask your contractor how long he believes it will take to complete your job and then add an extra eight weeks to help manage your expectations. I’m not saying that contractors can’t finish on time, but there are so many unforeseen incidents that can happen on a construction site that the possibility of your job ending right on time is pretty slim.
Experienced contractors generally know what to expect before crew members strap on their tool belts. But there often are at least a couple of assumptions that cannot be confirmed until work begins. These are the surprises that bust budgets or cause cautious contractors to pad their estimates. It’s much better to do limited demolition or electronic scanning if necessary before you sign a contract so there are no late discoveries that could delay progress or impact costs. Also, be certain all products and materials will be on hand before construction begins. It’s hard enough to coordinate multiple subcontractors without worrying whether the cabinets will be delivered in time.
A small army of workers will come and go in the course of a job as work progresses between demolition, rough framing, plumbing, electrical, HVAC, drywall, flooring, millwork, finishes, fixtures and clean up. Many may be subcontractors you never met before. Find out who will be on the job every day from start to finish, so you know whom to approach with questions or concerns.
We all have our preferences for how and when we like to communicate. It might be phone calls, emails, text messages or face to face meetings. Ask out how you and the contractor will communicate during the project. Get all of the relevant contact information and try to set up a plan for daily check ins.
It's not enough to know when your project is scheduled to start and the date when work should be completed. Done well, renovations are choreographed productions with multiple, sometimes overlapping scenes. A good contractor will have a flow chart that shows what work is scheduled for each day. Many are kept on computer files that are updated regularly. Get a copy so you know what to expect and so you can anticipate the impact if something slips. You may even be able to gain online access.
If you make changes after the project starts or the contractor discovers unforeseen carpenter ant damage, it will affect costs. Find out how changes and additional costs will be approved before they occur and how you will keep track of the changing budget.
Jobsites can resemble war zones. Ask your contractor in advance to explain in detail how he or she will protect your property, your family and your pets. Will they block heat and air conditioning registers and erect plastic curtail walls to contain dust and keep kids and pets out? Will they ventilate fumes from solvent-based finishes and adhesives? Will they test for the presence of lead paint on homes built prior to 1978 before they start demolition or surface prep? Will they cover floors and wrap door jambs to prevent nicks and scratches? Will they clean up the jobsite and secure their tools at the end of each day? Will they keep heavy delivery trucks off your driveway and place thick wood planks under the dumpster?
Don't wait until the end of the project to nail down what documents you will receive. You will want to collect product registrations, owner’s manuals, manufacturer warranties, contractor workmanship guaranties, inspection approvals and lien waivers certifying that subcontractors and suppliers have been paid.
Living through a remodeling project can be tough. To rough it smoothly, get smart from the start.